Gas Pipeline DN 48” – L=56 km, connecting the Trans Adriatic Pipeline (TAP) terminal in Melendugno (LE) to national gas transportation network at the pig trap station in Brindisi (BR).
Activities to be performed:
- Basic design
- EIA
- Detail design for construction and material purchasing
- Preparation of the Tender Package for Construction Contractors
Client: Snam Rete Gas S.p.A.
Awarded in February 2015 – Completed in November 2017
- 14.04.2015
- |
- 11.43