AKCO pipeline project (Kazhakhstan)

AKCO pipeline project (Kazhakhstan)

FEED activities for the replacement of Sour Oil and Gas Pipelines comprises:

  • CASE 2: n. 2 off 28” Cladded Pipelines – L=100 km each
  • CASE 3 bis: n.2 off 20” Seamless CS Pipelines + n.1 off 28” Cladded Pipeline – L=100 km each

The detailed SoW is described in the following:

  • Basic Design&FEED of Pipeline System from Island D (including riser) to OPF
  • Preparation of Supply Packages for the following materials
  • Constructability Study
  • Precommissioning Procedures (OPTIONAL)
  • Preparation of ITT packages for EPC Contractor (OPTIONAL)

Client: Tecnomare S.p.A. (eni e&p)

Awarded in July 2014 – ongoing

  • 13.05.2015
  • |
  • 16.47
Per raggiungere i nostri obiettivi ci affidiamo ai principi di integrità che ci guidano. Scopri la Governance Techfem