FEED activities for the replacement of Sour Oil and Gas Pipelines comprises:
- CASE 2: n. 2 off 28” Cladded Pipelines – L=100 km each
- CASE 3 bis: n.2 off 20” Seamless CS Pipelines + n.1 off 28” Cladded Pipeline – L=100 km each
The detailed SoW is described in the following:
- Basic Design&FEED of Pipeline System from Island D (including riser) to OPF
- Preparation of Supply Packages for the following materials
- Constructability Study
- Precommissioning Procedures (OPTIONAL)
- Preparation of ITT packages for EPC Contractor (OPTIONAL)
Client: Tecnomare S.p.A. (eni e&p)
Awarded in July 2014 – ongoing