Engineering
“Hydrogen-ready” pipeline Foligno-Gallese
-
Client Snam
-
Location Foligno-Gallese
-
Timing 2020

Feasibility study, final design, environmental impact study and executive design for the renovation of a 110 km long and 650 mm nominal diameter gas transport infrastructure in a hilly area characterized by significant seismicity in central Italy, developed both for methane gas and hydrogen transport in accordance with GASD-H standards.
- 17.11.2021
- |
- 16.08