New multiphase 26” x 18 km sealine from Baltim SW to Nidoco 11 area.
Techfem SoW is the following:
– BEDD wall thickness calculation and MTO
– Route optimization and general layout
– On bottom Stability Analysis
– Landfall Study: preliminary shore approach study, method statement and drawings to define the construction and installation of pipeline
– SoW for Basic Design
– Preliminary expansion analysis and expansion Loops/Spools Design
– Global buckling analysis
– Crossing study
Client: Eniprogetti S.p.a./ Petrobel
Awarded in May 2017 – Completed in July 2017