Development of an extended Front End Engineering Design and preparation of the EPC tender documentation of the 159-km gas pipeline interconnector between Malta and Sicily island.
The scope of work encompasses the design of:
- 151-km offshore section
- 7-km onshore section in Italy
- 1-km onshore section in Malta
- both shore approaches in Italy and Malta
- terminal stations in the vicinity of Gela and Delimara port
Client: Ministry for Energy and Water Management of Malta
Awarded in October 2018 – ongoing
- 5.03.2019
- |
- 17.51