Keeping up with our commitment to the main operators involved in the transformation of the national energy systems across all factors of the energy trilemma, including the security of gas supplies.
We are currently developing the engineering of strategic infrastructures along the entire value chain in our homeland.
Among other works in progress in the Italian territory, we are designing:
– the implementation of the so-called Adriatic Line, a new 48” backbone gas pipeline between Sulmona (AQ) and Minerbio (BO);
– the capacity expansion of the PRT receiving terminal of the Trans Adriatic Pipeline in Melendugno (LE);
– the connection to the national grid of the FSRU-type LNG regasification terminal in Ravenna;
– the strengthening of several underground gasstorage facilities in Northern Italy.
- 10.02.2023
- |
- 15.27